See the trust boundary behind the process.

Plant security goes beyond a device list. Review inventory, access paths and decision authority together at Harbor, keeping physical consequences visible throughout.

Open the plant dossier

Select a boundary. Find the question behind it.

This map describes declared dependencies. Arrows are not actual reachability or firewall validation.

Review question

Were all routes reviewed; is there a connection bypassing the DMZ?

Declared relationship
Jump point → engineering station
Review owner
Access owner
Open the related guide

The safety zone is shown separately. Neither absence of a connection nor presence of a reference establishes process safety.

Study sequence for your role

  1. 1OT asset inventory and process context
  2. 2Zones, conduits and trust boundaries
  3. 3Engineering stations and project integrity
  4. 4Vendor and remote-access management
  5. 5OT vulnerability, patch and change management
  6. 6Passive OT monitoring and anomaly review
  7. 7Safety-led industrial incident response
  8. 8Validated OT recovery and return to operations

A learning recommendation; choices stay on this page. No account progress, points, field authority or certificate is created.

8 topics, 24 explained scenarios

8 modules

01

OT asset inventory and process context

Move from an IP list to an inventory with process, ownership, dependencies and evidence provenance. Investigate why a Harbor plant asset is absent from observations.

Beginner → intermediate → advanced
02

Zones, conduits and trust boundaries

Review a fictional plant diagram using an actual local JSON model. Distinguish what DMZ, control and safety boundaries establish and what remains unproven.

Beginner → intermediate → advanced
03

Vendor and remote-access management

Evaluate identity, target, duration, local sponsorship and session evidence rather than treating a VPN as sufficient.

Beginner → intermediate → advanced
04

Engineering stations and project integrity

Manage project files, revisions, removable media and legacy-system risks with process context; a running workstation is not a validated system.

Beginner → intermediate → advanced
05

OT vulnerability, patch and change management

Assess CVE scores alongside process impact. Connect vendor validation, representative testing, maintenance windows and rollback evidence.

Beginner → intermediate → advanced
06

Passive OT monitoring and anomaly review

Avoid premature conclusions from a new flow or quiet sensor. Interpret observations through coverage, maintenance, time and process context.

Beginner → intermediate → advanced
07

Safety-led industrial incident response

Do not blindly transfer IT isolation reflexes to OT. Keep process authority, physical impact, communications and evidence visible in the same decision.

Beginner → intermediate → advanced
08

Validated OT recovery and return to operations

Identify dependencies from file backups to accepted process functionality; distinguish a booted computer from validated production.

Beginner → intermediate → advanced

Question the drawing. Review the path.

Use two synthetic JSON models to find declared shortest paths, a DMZ bypass and missing review records. The Node.js kit needs no package installation or network connection; results do not validate equipment, SL/SIL or safety.

Open the browser plant desk
Download the Harbor Plant kit